24/7 emergency response · Crews dispatched from Toronto · ~60 min arrival across the GTA · (289) 814-1447
Our work · Residential · Finished rooms

Sealed rooms and HEPA air scrubbing in a finished interior

Walls, doors and ceiling vents sealed, a zippered entry, and HEPA air scrubbers exhausting through lay-flat duct — set up before any removal work began.

  • Reinforced poly on walls and doors
  • Ceiling vents and fixtures sealed
  • Floor protection
  • Zippered entry
Crews on call 24/7 · Toronto & GTA

Need this done at your property?

Tell us what's happening. A real person from our team will call you right back — day or night.

Is water still coming in?
Private & secure. We never sell your information.
24/7/365 — real people answer
IICRC-certified technicians
Fully insured · WSIB covered
We bill your insurer directly
On the job

Photos from the field

Straight from our crew's phones — no staging, no stock images.

HEPA air scrubber with lay-flat duct exhausting through a sealed window
Lay-flat duct carries filtered air out of the work zone through a sealed window.
Reinforced poly sealing a finished wall floor to ceiling
Finished walls sealed floor to ceiling with reinforced poly.
Sealed hallway with protected floor and ceiling vent covered
Hallway sealed, floor protected and the ceiling vent covered.
Hallway containment with a zippered entry and sealed door
A zippered entry controls access; doors to unaffected rooms stay sealed.

Finished homes need a careful setup

Pot lights, painted walls and new flooring can't take abuse. We seal finished surfaces with reinforced poly and surface-safe tape, cover ceiling vents and fixtures, and protect floors before any work starts.

Filtered air out, clean air in

HEPA air scrubbers filter the air inside the work zone and exhaust it outdoors through lay-flat duct. That keeps dust and spores from travelling to the rest of the home.

One controlled entry

A zippered door is the only way in and out. Doors to unaffected rooms stay sealed, and the crew changes out of dirty gear at the entry.

What we did

  • Reinforced poly on walls and doors
  • Ceiling vents and fixtures sealed
  • Floor protection
  • Zippered entry
  • HEPA air scrubbers with outdoor exhaust
Planning similar work? Every job starts with an assessment and a written scope. Read how we work with your insurance claim.
FAQ

Questions about this kind of job

How long does containment stay up?

As long as the work inside needs it — usually a few days. We remove it only after cleaning and, where needed, verification.

Need this done at your place?

Talk to a real person now — day or night. We explain the plan before we start.

Call (289) 814-1447
Call nowRequest help