24/7 emergency response · Crews dispatched from Toronto · ~60 min arrival across the GTA · (289) 814-1447
Our work · Residential · Basement

Full basement containment before removal work

Every room sealed floor to ceiling, light fixtures and openings taped off, and HEPA air scrubbers running before a single damaged material came out.

  • Room-by-room poly containment
  • Critical barriers on openings and fixtures
  • Floor protection
  • HEPA air scrubbers staged before removal
Crews on call 24/7 · Toronto & GTA

Need this done at your property?

Tell us what's happening. A real person from our team will call you right back — day or night.

Is water still coming in?
Private & secure. We never sell your information.
24/7/365 — real people answer
IICRC-certified technicians
Fully insured · WSIB covered
We bill your insurer directly
On the job

Video and photos from the field

Straight from our crew's phones — no staging, no stock images.

Walkthrough of a fully contained basement. Walkthrough of a basement sealed room by room with reinforced poly, taped critical barriers and HEPA air scrubbers staged for removal work.
Basement rooms sealed with reinforced poly and red containment tape
Walls, openings and ceiling fixtures sealed before anything is disturbed.
HEPA air scrubber and wrapped equipment inside basement containment
HEPA air scrubbers staged inside the containment; equipment is wrapped to keep it clean.
Critical barriers taped around a basement doorway and ceiling
Critical barriers around doorways and bulkheads keep the work zone isolated from the rest of the home.

Why containment comes first

Cutting out wet or mouldy drywall, insulation and flooring releases dust and spores. Without containment they travel up the stairs and through the ductwork. IICRC S520 calls for containment sized to the contamination and the work, and this basement needed the full treatment.

What we set up

Reinforced poly walls with taped seams, critical barriers on doorways, bulkheads and ceiling fixtures, protected floors, and HEPA air scrubbers running before removal started. The rest of the house stays usable while we work.

Older basements need a test first

Some GTA basements still have older floor tiles, plaster or pipe wrap that can contain asbestos. When materials are suspect, we test before disturbing them and quote any abatement separately, as Ontario regulations require.

What we did

  • Room-by-room poly containment
  • Critical barriers on openings and fixtures
  • Floor protection
  • HEPA air scrubbers staged before removal
  • Suspect materials flagged for testing
  • Photo documentation before, during and after
Planning similar work? Every job starts with an assessment and a written scope. Read how we work with your insurance claim.
FAQ

Questions about this kind of job

Can we stay home while you work in the basement?

In most cases, yes. Containment and HEPA air scrubbing keep the work zone isolated from the rest of the house. We tell you honestly if a room or the home should be vacated.

Is containment covered by insurance?

When the underlying loss is covered, containment is normally part of the mitigation scope. We document it with photos and line items your adjuster can review.

Need this done at your place?

Talk to a real person now — day or night. We explain the plan before we start.

Call (289) 814-1447
Call nowRequest help